Easy Permits
For builders & dealers

Stop finding out a project has a permit problem after you've sold it.

Design it right before you submit it. Check every job while you quote, fix problems upfront, then hand the permit to us.

Your jobs5 active · checked before quotingPortal
Nguyen familyVerandah · Geelong VICPasses
R. PatelCarport · Werribee VIC1 fix: lower 300 mm
Harris & CoPatio · Logan QLDPermit submitted
M. KowalskiShed · Ballarat VICPermit issued
S. AhmedPergola · Ipswich QLDPasses
Where jobs stall

Most permit delays are baked in before you apply.

A setback missed at the quote turns into weeks of back-and-forth once the application is in. Catch it first and it never happens.

Council referrals

A structure too close to the boundary triggers an extra approval nobody planned for.

Redesign requests

The surveyor sends it back, the customer has to re-sign, and the job sits in limbo.

Callbacks and late starts

Customers chase you for updates while crews wait on a permit that isn't moving.

How it works

Design it right before you submit it.

01
Check it while you quote

Enter the address and design. The portal loads the real boundary and flags setbacks, overlays, easements and approval triggers.

02
Redesign before you apply

Adjust the height, size or position until it passes, and quote the version that will actually get approved.

03
Submit through us

Send the job to Easy Permits with your engineering. We handle plans, approvals and lodgement through to final inspection, with every status in your portal.

What you get

Faster permits. Fewer surprises. Sooner on site.

Catch setbacks and overlays before you submit

See boundary setbacks, overlays, easements and approval triggers while the job is still on the drawing board.

Redesign before you apply

Adjust the height, size or position until it passes, so the application goes in right the first time.

Fewer council referrals and delays

Avoid the referrals, dispensations and redesign requests that stall ordinary permit applications.

Manage all your clients in one portal

Every job, site and permit status in one place, across your whole pipeline.

Faster start on site

Fewer callbacks and surprises, so crews start sooner and jobs close faster.

White-label reports for your customers

Send compliance reports under your own brand, so customers see a clear plan before they sign.

White-label reports

Your brand on every compliance report.

Send customers a clear report with your logo: what they're getting, that it's likely to comply, and how the permit will be handled. It helps close the job.

YOUR LOGOCompliance report
Verandah · 6.0 × 4.0 mPrepared for the Nguyen family · Geelong VIC
Distance from the side fence · 1.2 m. Passes
Site coverage · 48%. Limit is 60%
Height near the rear boundary · Lowered 300 mm in store. Now passes
Easements and overlays · None on this block
Likely to comply. Permit handled by Easy Permits.

Check your next job before you quote it.

A 15-minute demo on a real job from your pipeline.

Try the portal