Hand us your permits. Get more jobs to site.
Planning permits, dispensations, drafting and chasing council: we take the whole Victorian permit pathway off your team, for one fixed fee per job.
7 in 10 Victorian verandah, patio and shed jobs need an extra council approval.
Around 7 in 10 Class 10a projects now trigger another application before the building permit can issue. Until it's sorted, the job is sold but your crew can't start.
Triggered by zones, overlays or covenants on the block.
When a wall on or near the boundary runs longer than the rules allow.
When the structure looks into or shades a neighbour's yard or windows.
When footings sit over a drainage or sewer easement.
Any other consent the building surveyor needs before the permit can issue.
Every in-house fix costs you something.
Tell them they need a planning permit or dispensation and let them apply. Most find it daunting, so jobs stall, cancel or drag on for months.
Hire someone to run it and charge the customer around $500. Many push back and try it themselves, and you're back to stalled jobs.
Run it in-house at no charge. It works, but it takes full-time staff to chase customers, councils and paperwork.
Permit-ready plans from a drafting business cost around $300 a job. At volume, that's a six-figure line item.
One fee. The whole permit pathway.
$1,950 per permit in Victoria, paid when the permit is ready. Council lodgement fees are separate.
How one of Victoria’s largest verandah and patio builders unlocked millions in sold work.
One of Victoria’s largest verandah and patio builders completes hundreds of projects a year. As more of those jobs needed extra council approvals, permits became the bottleneck on growth, cashflow and installation.
Leaving it to customers stalled jobs. A paid service got pushback. Doing it in-house for free halved the blocked work, but took two full-time staff and around $150,000 a year in outside drafting. They handed their Victorian permits to Easy Permits at $1,950 per permit, drafting and extra council applications included.
- 2
- internal roles no longer needed
- ~$150K
- a year in drafting costs removed
- +20%
- more blocked work unlocked, on top of the in-house gains
- Millions
- of dollars of sold work released to installation
Faster permits. Fewer stalled jobs. More verandahs to site.
Your brand on every compliance report.
Send customers a clear report with your logo: what they're getting, that it's likely to comply, and how the permit will be handled. It helps close the job.
Hand us your next permit.
A 15-minute call on how the package fits your jobs, with a demo of the Compliance Checker.